Mar-key designed and built the storage unit to the customers specification to accommodate a large Motorised home.
The build area previously had buildings on so the customer asked that the existing pad be utilised for the new build. This meant that the surface was suitable for anchoring the new build.
The structure designed, manufactured and built was a 4m x 10m on a 4m leg with a 3.6m x 3.6m roller door and fully clad in single skin steel panels. Find out more about our storage space structures here.
Mar-Key Group were delighted to have won the contract to replace a tired old building used for stores with an up to date and fresh warehouse.
View case studyAn Essex-based business needed to add storage space to their site quickly whilst redevelopment of their head office took place.
View case studyOur client needed a temporary storage solution on the same site as their current warehouse. A sliding door and strip lights provided practicality.
View case studyWe erected a loading bay structure in less than 7 days, measuring 27m x 22.5m depth to provide valuable storage space for pallets.
View case studyWe have been supplying structures to CSG Events and ITV for over 3 years. Our structures provide additional filming space including Dancing on Ice and Masked Singer.
View case study