Nottingham Forest Gym Facility

With just four weeks to build, we provided a fully insulated gym and physio facility for the Nottingham Forest FC first team in time for pre-season. …

Find out more
Emirates Team New Zealand

We designed, exported and built an insulated solution suitable for housing and craning the race boat for Emirates Team New Zealand. Standing proud on …

Find out more
Permanent Venue Build

Located on a beautiful site in Berkshire, our team built a brand new venue to accomodate more event bookings….

Find out more
Adelaide500

We designed and manufactured this very unique sun shade for the pit straight of infamous Adelaide500 event….

Find out more
Bermuda Build

The team headed over to Bermuda in November 2016 to begin work on new structures, located right on the waterfront….

Find out more
Tottenham Hotspur FC Training Facility

We were approached by Tottenham Hotspur to provide a solution for the Ladies 1st Team facility. At the time, the ladies team was training out of a loc…

Find out more
Port Warehousing

We delivered an impressive 45,000sqm of warehousing, working to a tight build schedule and signing off three weeks later….

Find out more
Fan Zone Canopy

Our canopy outside of the City Ground incorporates enclosed bays and gable end to entirely protect equipment from the elements….

Find out more
Changing Room Facilities

We were chosen to deliver a home and away changing room facility to Saracens RFC whilst a new stand and changing room were constructed….

Find out more
Warehouse Evolution

Originally a loading canopy, as our client’s business evolved, so did our structure….

Find out more
Pushing the Boundaries

The bespoke warehouse design covers exactly 550 sqm, consisting of a 20m x 30m frame with 5m x 10m cut-out. …

Find out more
Dance Studio

We delivered a fully-fitted studio for our client located on the site of a local leisure facility to provide additional class space….

Find out more
National Grid Storage

We designed, supplied and installed a warehouse structure to provide storage space, covering a total of 3,500sqm….

Find out more
Classroom Facilities

A school trust sought a solution to their RAAC issues. We went from enquiry to delivery in just one week….

Find out more
Semi Permanent Café

We were approached by CORMAC to install a semi-permanent structure to the airport building to make way for a new café area for customers….

Find out more
Modular Buildings For Schools

The client looked to hire a sports hall and dining facility for an initial six months. Delivered within a one-week window, the project went directl…

Find out more
Lovehoney

Lovehoney has grown massively in a decade and has overgrown itself, hence the client required more space….

Find out more
Demountable School Building

A school sought a solution to their RAAC issues. We delivered a demountable school building quickly so that students could return to class….

Find out more
Tennis Court Cover Covers

This tennis court cover enabled this school to continue to provide use of its sports facility whatever the weather on one of the three courts….

Find out more
Loading Bay Canopy

We supplied a 13m x 15m loading canopy for a distribution centre, providing necessary cover for loading goods onto lorries in any kind of weather….

Find out more
Loading Bay Structure

We erected a loading bay structure in less than 7 days, measuring 27m x 22.5m depth to provide valuable storage space for pallets….

Find out more
Insulated Workshops

Our Structure Solutions division designed, manufactured and installed three identical, insulated workshops, which equated to an additional 900sqm of c…

Find out more
Warehouse Loading Bay Canopy

SJ Containers are renowned for providing modular space such as shipping and storage containers, but when they needed additional space at their warehou…

Find out more
Garden Centre Storage

Our retail client did not have enough storage space ahead of their busiest period. We designed a suitable solution for them. …

Find out more
Sixth Form Extension

Highcliffe School required additional space for their 6th Form students. We created a 60sqm building that blended seamlessly with existing facilities….

Find out more
Semi-Permanent Gym Studio

An indoor tennis centre were looking to expand their facilities with a standalone studio, which would provide space to train….

Find out more
Budgens Store

We designed and installed a 20m x 30m structure that fitted into a space in the the original Budgens car park whilst the main store was being rebuilt….

Find out more
School Facilities

With existing facilities due to be knocked down, we provided 3 additional spaces for Langley Park School, with minimal disruption….

Find out more
Retail Store

We were chosen to deliver a retail store, to provide additional trading space whilst the main store underwent refurbishment….

Find out more
Kitchen Extension

Our solution provided kitchen space during their refurb, providing rain and wind cover when they are delivering food….

Find out more
Audience Holding & Prop Workshop

We have been supplying structures to CSG Events and ITV for over 3 years. Our structures provide additional filming space including Dancing on Ice and…

Find out more
Workshop Extension

Their brief was to build a workshop extension that linked to the existing production facility….

Find out more
Tesco Stores

We quickly built additional retail environments for our client on two separate sites, complimenting their existing structures….

Find out more
Workshop Facility

While maintenance of their warehouse took place, we erected a 10m x 40m warehouse to be used as a workshop and for storage of tools….

Find out more
Semi Permanent Facility

Mar-Key Group were proud to be awarded the contract to supply a Semi-Permanent Facility at Ditton Park Manor House…

Find out more
Semi Permanent Venue Structure

Our client wanted to expand their venue space to cater for larger capacity bookings….

Find out more
Pallet storage

An Essex-based business needed to add storage space to their site quickly whilst redevelopment of their head office took place….

Find out more
Insulated Boat Storage

We manufactured a bespoke 8.5m x 19m structure that could be used as a boat maintenance facility, and a great addition to their warehouse facility….

Find out more
Warehouse Structure

Mar-Key Group were delighted to have won the contract to replace a tired old building used for stores with an up to date and fresh warehouse. …

Find out more
Semi-Permanent Storage

We manufactured this 10m x 30m fully insulated structure to add some additional storage to their operation close by to their premises….

Find out more
Healthcare Facilities

We quickly delivered two units, a reception area at the Southampton General Hospital, and a drive-through Covid-19 testing centre in Shrewsbury….

Find out more
Industrial Storage Facility

Mar-key designed and built the storage unit to the customers specification to accommodate a large Motorised home. …

Find out more