We designed, supplied and installed a temporary industrial warehouse structure, covering a total of 3,500 square metres to provide the end client with a huge amount of additional storage space. Construction of the main building took approximately 2 months and it is expected to remain in situ for up to 10 years, throughout which time Mar-Key Group will continue to maintain the structure.
Coverage: 3,500 sq meters
Structure width: 25m
Leg height: 8m
Location: Oxfordshire
The structure is finished with sheet metal cladding to provide a durable, long-term storage solution. This temporary industrial warehouse is also complete with 7 metre wide roller shutter doors to allow for easy access and goods movement.
The structure was manufactured completely in-house using our own aluminium profiles, and we also manufactured the thermo-inflatable roofs and blew them up with our bespoke air pump system (the only temporary structure manufacturer to do this in-house in the UK!).
Speaking on our recent project, Managing Director Phil Grenville-Hunt commented ‘We’re thrilled to have been able to have supplied to this client and showcase our industrial capabilities. We faced some challenges along the way but the team really pulled together to deliver a fantastic temporary warehouse.’
View our temporary storage structure page or get in touch.
An Essex-based business needed to add storage space to their site quickly whilst redevelopment of their head office took place.
View case studyWe manufactured a bespoke 8.5m x 19m structure that could be used as a boat maintenance facility, and a great addition to their warehouse facility.
View case studyWe supplied a 13m x 15m loading canopy for a distribution centre, providing necessary cover for loading goods onto lorries in any kind of weather.
View case studyOur client needed a temporary storage solution on the same site as their current warehouse. A sliding door and strip lights provided practicality.
View case studyWe manufactured this 10m x 30m fully insulated structure to add some additional storage to their operation close by to their premises.
View case study